Bathroom plumbing
Bathroom re-pipe & fit-off
Corroded old pipes replaced in copper and PEX, ready for a full bathroom renovation.
- Location
- Northcote
- Scope
- Bathroom plumbing
- Completed
- August 2026
Before
After
Drag the handle to compare before and after.
About this project
Low water pressure and rusty water were the first signs that the original pipes had reached the end of their life. We re-piped the bathroom and laundry, moved the waste for a new freestanding bath, and came back after the tiler to fit off the tapware, vanity and shower. We arrived in the window we promised, protected the floors, and left the site cleaner than we found it.
Projects